PROJECTS

4 St James’ Villas, Winchester

Located in Winchester, our recent residential extension project showcased our commitment to quality and efficiency. The addition of a basement necessitated the installation of 22x 76RR Diameter screwpiles, a task made challenging by restricted access within the property.
Utilizing our specialized equipment, specifically the 65kg 700H Handheld Torque, we were able to overcome these constraints and achieve an impressive average depth of 6 meters. Despite the complexity of the task, our team completed the project well ahead of schedule, finishing in just three days, well within the one-week deadline.
Our skilled professionals at ScrewPiling UK brought their expertise to bear, ensuring the seamless execution of the project and turning our client’s vision into reality. This successful endeavour showcases our dedication to delivering exceptional results on every project we undertake.

 ScrewPiling UK provided 22 screwpiles at 6m depth, 15Kn Torque & averaging 76mm diameter.

Installation in Restricted Access

Handheld Torques

Screwpiling UK have 2 different options in the case of extremely restricted access piling - we have two handheld excavators at 400H and 700H respectively, ready to be deployed at any site.

MORE PROJECTS

29 Beaucroft Lane, Wimborne

The Wimborne residential project, featuring a garage extension, concluded remarkably ahead of time in just 2 days instead of the planned week, resulting in a 56m² double garage. Utilising an 8-ton Kubota x60 Excavator and 17 screwpiles with a 5m average depth, this efficient completion was achieved in collaboration with MPS Building LTD.

22 Crichel Mount, Sandbanks

In our recent residential extension project, 22 screwpiles were installed to strategically enhance the existing garage and terrace area. Executed by the dedicated team at Screwpiling UK for MPS Building Contractors, the renovation achieved an average depth of 6 meters for each 76mm diameter screwpile within a remarkable 1-week timeframe, surpassing expectations. The project utilized our 8-ton Kubota excavator, demonstrating efficiency and excellence in execution.